Schedules & Tasks

Construction scheduling software from bill of quantities to 4D progress

Generate a construction schedule directly from your bill of quantities, manage tasks with dependencies in Gantt and Kanban views, and watch progress on the 3D building model with 4D BIM.

From BoQ
Automatic generation
4 types
Task dependencies
4D BIM
Schedule on the 3D model

Why do you need construction scheduling software?

An Excel schedule goes stale the day it is handed over - nobody updates it, dependencies live in the site manager's head, and delays surface too late. Specialized software keeps the plan alive.

Schedules built by hand

Hours spent copying BoQ items into cells and drawing bars. Every change in the estimate means starting over.

Invisible dependencies

Formwork, rebar, pouring, curing - the technological sequence lives in one person's head. One shifted task breaks the whole chain.

Delays discovered late

Without a critical path and a baseline you cannot see which delay moves the end date. You find out when the deadline is already gone.

Progress detached from the plan

The site moves, but nobody compares actuals to plan. Reports are verbal, and the client asks every week where you stand.

Key features of the scheduling software

Construction Team covers the full cycle - from generating the plan to tracking execution on the 3D model.

Automatic generation from BoQ

The generator recognizes the trade of each item, orders activities in technological sequence, phases them by floor and lays the work onto a working calendar.

Task dependencies

Four link types (FS, SS, FF, SF) with lag in days. The system blocks circular dependencies and draws links as arrows on the timeline.

4D BIM - schedule on the 3D model

Element-to-activity links between the IFC model and the schedule. Simulate construction day by day and color elements by status against the plan.

Gantt view and Kanban board

A timeline with drag-and-drop dates and a status board for daily management. Both views work on the same tasks.

Critical path, baseline and resources

The critical path is computed automatically and highlights tasks with zero float. The baseline keeps the plan for plan-vs-actual comparison, and the resource check catches double-booking.

Progress and deadlines

Quantity and completed quantity for measurable progress, statuses, priorities, overdue tasks and the next due date for every schedule.

How Construction Team works for scheduling

Four steps from bill of quantities to a living schedule:

1

1. Create from a source

Create a schedule from a BoQ, contract or offer and pick a method - automatic generation by cost codes or a basic sequential import.

2

2. Automatic sequencing

The system classifies items, adds dependencies and technological pauses (such as concrete curing), phases work by floor and computes durations on a working calendar.

3

3. Review and adjust

The Assumptions panel shows what the schedule is built on. Adjust trades, dates and dependencies - with Remember the system learns your correction for future schedules.

4

4. Track execution

The team moves tasks on the Kanban board, progress is computed from quantities, and the 4D view colors the 3D model by status against the plan.

Who is the scheduling software for?

For any construction firm that plans and reports work across sites:

Site managers

Daily task management on the Kanban board - statuses, priorities, assignees.

Project managers

Gantt view with critical path and baseline - see which delay moves the end date.

Owners and directors

Progress across all sites in one place - completed tasks, overdue items, upcoming deadlines.

BIM coordinators

Link the IFC model to the schedule - process simulation and visual status of every element.

Scheduling software vs Excel

Why specialized software replaces the spreadsheet schedule:

FeatureExcelConstruction Team
Schedule creationManual copy from BoQAutomatic generation from items
DependenciesIn the planner's head4 link types with validation
Critical pathManual coloringAutomatic computation
Date changesManual recalculationDrag and drop in Gantt
Plan vs actualNew copy of the fileBaseline comparison
ProgressManual percentagesFrom quantities and statuses
4D visualizationNoneSchedule on the 3D model

Frequently asked questions about scheduling software

How is a schedule generated from a bill of quantities?+

Create a schedule from a BoQ and pick the cost-code method. The generator recognizes each item's trade (by cost code, catalog item, IFC type or keywords), orders activities in technological sequence, adds dependencies and phases the work by floor on a working calendar.

Which task dependency types are supported?+

The four standard types - Finish-to-Start, Start-to-Start, Finish-to-Finish and Start-to-Finish, plus lag in days, for example for concrete curing. Circular dependencies are blocked.

What does the critical path show?+

The chain of tasks with zero float - any delay on it moves the end date. Toggle it in the Gantt view and it is highlighted in red, so you know where to focus resources.

What is 4D BIM and how does the schedule connect to the 3D model?+

The 4D view links elements of the IFC model to schedule activities. For schedules generated from a BoQ the links are derived automatically; manual assignment is available via selection in the 3D view. You get a day-by-day construction simulation and element coloring by status against the plan.

How accurate is the auto-generated schedule?+

It is an engineering draft with roughly ±30-50% accuracy - a solid starting point based on average production rates. Review the assumptions and adjust durations to your crews and site conditions before using it for contractual deadlines.

Can I correct a misclassified trade?+

Yes. Correct the item once for the current schedule only, or choose Remember - the system saves the rule and future schedules recognize the same item automatically. Saved rules are managed in settings.

Can I export the schedule?+

Yes - export the timeline to PDF and the schedule list to Excel or PDF. Each schedule also keeps a version history when regenerated.

Plan your projects with a living schedule

Free 14-day trial. No credit card.

Register for free